Cambridge Housing Authority (CHA) is excited to be advancing the opportunity to create new affordable housing in order to better serve our shared community and confront the state’s housing affordability crisis.
CHA is undertaking this work at Corcoran Park, a 153-unit affordable housing community in Strawberry Hill that we own and manage. Built in 1951, the community consists of 24 townhouse-style buildings, an 8-unit building, a maintenance garage, and a community building on 8.1 acres. In order to address the critical capital needs of the buildings and site, as well as expand affordable housing, CHA envisions replacing the outdated buildings. In their place, CHA will construct approximately 291 deeply affordable rental units in all-electric buildings built to Passive House standards that prioritize sustainability. The project will increase the amount of affordable housing by roughly 138 units, while enhancing open spaces and addressing long-term issues with flooding and subsidence at the site. The project is anticipated to be completed in three phases.
CHA has been working with a team of design professionals led by Studio G Architects to determine the most appropriate plan for the revitalization of Corcoran Park. Based on this work, CHA has determined that the major capital needs and poor accessibility can only be comprehensively addressed via a new construction approach.
Phase 1
In the winter of 2025-2026, CHA completed the Planning Board consultation process for Phase 1. This submission followed a robust resident and community engagement process. Phase 1 of the project is the portion of Corcoran Park north of Lawn Street and west of May Street, currently comprising four buildings and a small parking lot. This 1.53-acre lot currently contains 29 units. Phase 1 involves the demolition of those structures and new construction of a 46-unit four-story elevator building and a 21-unit three-story townhomes-over-flats building for a total of 67 units after redevelopment. All units will be deeply affordable (residents pay only 30% of their income on rent). Depending on the availability of funding, CHA hopes to start construction on Phase 1 in December 2026.

Phases 2 and 3
CHA has presented a master plan for the redevelopment of the Phase 2 and 3 portion of the site to residents and neighbors at a series of meetings in 2024 and 2025. However, CHA is currently reevaluating this master plan based on updates made to the City of Cambridge’s Long Term Flood Elevations (LTFEs) in July 2025. LTFEs define the minimum elevation that buildings must be built to, and due to increased risk of flooding related to heavy rain events, the updated LTFEs had a significant impact on the Phase 2 and 3 parcel. CHA hopes to advance the planning process for this part of the site in 2026.

Key design and meeting documents can be found below.
For general questions about the Corcoran Park revitalization, please contact Matthew Zajac at 413-887-8917 or mzajac@cambridge-housing.org.
General Information
- Existing Conditions Report
- Project Introduction Flyer
- Resident Meeting Posters – December 2023
- Resident Meeting Presentation – February 2024
- Neighborhood Gathering Posters – August 2024
- Resident Meeting Presentation – September 2024
- Resident Meeting Presentation – October 2024
- Resident Meeting Presentation – January 2025
- Resident Meeting Presentation (Landscape Design) – May 2025
- Frequently Asked Questions
- Affordable Housing Overlay – Community Meeting 1 Slides – February 2025
- Affordable Housing Overlay – Community Meeting 1 Recording – February 2025
- Neighborhood Meeting #2 Slides – October 2025
- Neighborhood Meeting #2 Recording – October 2025
- Planning Board Consultation Meeting #2 Presentation – March 2026
Resident Relocation Meetings: